Independent guide, not APEPDCL. To verify, call 1912.
PM Surya Ghar in AP · how to

Apply for net metering
with APEPDCL.

By the EdgeGrid energy team · Updated 23 Nov 2026

You can apply on the DISCOM's site, at Mee Seva or on the national rooftop portal, and there is no fee up to 5 kW. APEPDCL checks feasibility, the net-metering agreement follows within four months, and if APEPDCL raises nothing within two weeks the agreement is treated as in force.

We never ask for OTP, bank details or fees.

the key numbers

No fee up to 5 kW. The agreement is treated as in force if APEPDCL raises nothing in two weeks.

₹0
fee up to 5 kW
4 months
to sign after feasibility
2 weeks
then treated as in force

Source: APERC rooftop solar net and gross metering rules, as amended in December 2025

step by step

how do I apply for net metering?

Apply online on APEPDCL's site, at a Mee Seva centre or on the national rooftop portal with your service number. APEPDCL checks whether the local network can take your system. After installation it inspects the system, fits the net meter and signs the net-metering agreement before switch-on.

PM Surya Ghar steps in AP

  1. 1

    Apply

    On APEPDCL's site, at Mee Seva or on the national rooftop portal, with your service number.

  2. 2

    Feasibility

    APEPDCL checks whether the local transformer and lines can take your system.

  3. 3

    Install

    An empanelled vendor installs the system.

  4. 4

    Agreement

    within 4 monthswhere it often stalls

    Submit the net-metering agreement within four months of feasibility.

  5. 5

    Net meter and switch-on

    APEPDCL inspects, fits the net meter and switches the system on.

Source: APERC rooftop solar net and gross metering rules, as amended in December 2025

fees

how much does it cost to apply?

Nothing for systems up to 5 kW, which covers almost every home. Larger systems pay a one-time application fee: ₹1,000 from 5 to 100 kW, ₹10,000 from 100 to 1,000 kW and ₹25,000 per MW above that. The fees are set by APERC and are the same across Andhra Pradesh.

Up to 5 kW
application fee
Nil
5 to 100 kW
application fee
₹1,000
100 to 1,000 kW
application fee
₹10,000
Above 1 MW
application fee
₹25,000 per MW

Source: APERC rooftop solar net and gross metering rules, as amended in December 2025

the agreement

what is the net-metering agreement?

It is the agreement between you and APEPDCL that sets how your imports and exports are measured and settled. Submit it within four months of the feasibility approval. If APEPDCL raises no objection within two weeks of receiving it, the agreement is treated as in force.

net meter not installed yet?

4 months
to submit
From the feasibility approval.
2 weeks
for APEPDCL to object
Otherwise treated as in force.

Source: APERC rooftop solar net and gross metering rules, as amended in December 2025

after switch-on

what changes on my bill after switch-on?

Your bill starts showing import, export and net units. For LT homes, exports offset imports, and you pay for net units at the normal slab rates plus fixed and customer charges. Units left over are carried forward and settled at the feed-in tariff, or can be shared with other consumers.

read a net-meter bill · earn more from your extra solar units

questions people ask

Is net metering available in Andhra Pradesh?+

Yes. APEPDCL, APCPDCL and APSPDCL all offer net metering for rooftop solar under APERC's rules.

How much does it cost to apply for net metering?+

Nothing up to 5 kW. Above that, ₹1,000 up to 100 kW, ₹10,000 up to 1,000 kW and ₹25,000 per MW beyond.

Where is the net-metering agreement?+

APEPDCL provides it after feasibility. Your vendor usually helps submit it. Keep a signed copy.

planning rooftop solar? ask before you pay.