Independent guide, not APEPDCL. To verify, call 1912.
PM Surya Ghar in AP · your problem

My PM Surya Ghar subsidy
hasn't come.

By the EdgeGrid energy team · Updated 23 Nov 2026

Check the status on the national portal first. Most held claims come from a name that doesn't match across Aadhaar, the bank account and the electricity bill, a bank account not linked to Aadhaar, or a step still pending after switch-on. Fix the mismatch, keep records, then raise a grievance or call 15555.

We never ask for OTP, bank details or fees.

subsidy stall checklist

0 of 5

Source: PM Surya Ghar portal steps as set out in DISCOM procedures and MNRE notices, 2024 to 2026

where it stalls

why hasn't my subsidy come?

The subsidy is claimed only after the system is switched on and inspected. Claims then stall most often on details: a name spelt differently on the bill, Aadhaar and bank account, a bank account not linked to Aadhaar, a wrong IFSC code, or pending dues on the electricity connection.

PM Surya Ghar steps in AP

1stage 1

Switch-on

Net meter fitted, system commissioned by APEPDCL.

2stage 2

Inspection

The installation is inspected and approved.

3stage 3

Claim

You submit bank details on the portal.

4stage 4

Transfer

Paid to your Aadhaar-linked account.

Source: PM Surya Ghar portal steps as set out in DISCOM procedures and MNRE notices, 2024 to 2026

fix it

how do I fix a mismatch?

Make the name match everywhere. If the electricity connection is in a parent's name, ask APEPDCL about a name change or apply in that name. Link your bank account to Aadhaar at your bank, and correct the IFSC on the portal. Then resubmit and keep screenshots of every step.

documents you need

who to ask

who do I ask in AP?

For the claim itself, raise a grievance on the national portal or call the PM Surya Ghar helpline, 15555, with your application number ready. For a step stuck with the net meter or inspection, write to your APEPDCL section office. If the vendor is the problem, use the vendor complaint route.

complain about a vendor · net meter not installed?

15555
PM Surya Ghar helpline
Keep your application number ready.
1912
APEPDCL helpline
For net-meter and inspection steps.

Source: Department of Telecommunications, short code 15555 for PM Surya Ghar

keep records

what should I keep?

Your application number, screenshots of each status, the vendor's invoice, the commissioning report and the net-meter details, and every grievance number. With these, a held claim can usually be traced to the exact step that needs fixing.

how much subsidy you should get

questions people ask

How can I check my solar subsidy status?+

Log in to the national PM Surya Ghar portal with your consumer number and mobile number. The application shows the pending step.

How many days does the subsidy take?+

It is paid after commissioning and inspection, once your bank details are verified. Delays usually come from mismatched details, so check those first.

Who do I complain to if the subsidy is late?+

Raise a grievance on the national portal or call 15555. For net-meter steps, write to your APEPDCL section office.

planning rooftop solar? ask before you pay.

Send your question on WhatsApp. A person replies with the AP steps that apply to you, and what to check before you sign.

We never ask for OTP, bank details or fees.