HT or LT
connection?

By the EdgeGrid energy team · Updated 23 Nov 2026

LT supply covers connected loads up to 150 kW, billed per unit with a fixed charge per kW. Above 75 kW, new connections get HT metering, and industry above 37.5 kW. HT is billed on demand in kVA plus cheaper energy, with time-of-day pricing, so it suits larger, steadier loads.

We never ask for OTP, bank details or fees.

the line

New connections above 75 kW get HT metering. Industry above 37.5 kW.

150 kW
LT's upper limit
75 kW
HT metering for new loads above
37.5 kW
for industry and EV stations

Source: APERC tariff order for FY2026-27, 25 March 2026

side by side

what is the difference between HT and LT?

LT supply is at 415 or 240 volts and is billed per unit, with a fixed charge per kW. HT supply is at 11 kV or above and is billed on demand in kVA plus energy per unit, usually at a lower energy rate but with a demand charge and time-of-day pricing.

join the business waitlist

Voltage
LT
415 V three phase, 240 V single phase
HT
11 kV and above
Load
LT
Up to 150 kW connected load
HT
Above that, or by choice above 75 kW
Fixed or demand charge
LT
₹75 per kW (commercial)
HT
₹475 per kVA of billing demand
Energy, commercial
LT
₹5.40 to ₹9.95 by slab
HT
₹7.65 at 11 kV
Rooftop solar exports
LT
Offset against imports
HT
Settled against imports in non-ToD hours

Source: APERC tariff order for FY2026-27, 25 March 2026

the limits

when must a business go HT?

LT tariffs apply to connected loads of 150 kW and below. Businesses with more than 75 kW can choose LT or HT up to 150 kW, but new connections above 75 kW are given HT metering. For industry and EV charging stations the line is 37.5 kW.

75 kW
HT metering for new loads
Commercial and most categories.
37.5 kW
for industry and EV stations
HT metering above this.

Source: APERC tariff order for FY2026-27, 25 March 2026

solar rules

how does rooftop solar differ on HT?

For LT connections, exports are offset against imports, and extra night imports are billed. For HT connections, exports are settled against imports in non-ToD hours, and power imported in ToD hours is still billed at the applicable tariff. So on HT, the time of day you export matters.

solar for factories

choosing

which is cheaper for my business?

For a large, steady load, HT's lower energy rate usually outweighs the demand charge. For a smaller or spiky load, the demand charge, set by your highest 15 minutes and never less than 80% of the contract, can make HT dearer. Work out both on a year of your bills.

demand charges explained · commercial tariff in AP

demand calculator

one peak, a month's charge

HT commercial at 11 kV: ₹475 per kVA of billing demand. Billing demand is your highest recorded demand or 80% of the contracted demand, whichever is higher. Demand above the contract is charged at twice the rate.

demand charge this month

₹90,250

billing demand
170 kVA
normal charge
₹80,750
penalty on 20 kVA above contract
₹9,500

Staggering the loads that start together could save about ₹9,500 this month.

Rates: APERC tariff order for FY2026-27, 25 March 2026.

questions people ask

What is LT in an electricity bill?+

Low Tension: supply at 415 or 240 volts, for connected loads up to 150 kW, billed per unit with a fixed charge per kW.

What is the difference between HT and LT connection?+

HT is supplied at 11 kV or above and billed on demand in kVA plus energy; LT is lower voltage and billed per unit with a fixed charge per kW.

Which documents are needed for a new connection?+

APEPDCL sets the list for each category. Ask your section office or check APEPDCL's website before applying.

get on the list before supply opens.