Green energy open access
in Andhra Pradesh.

By the EdgeGrid energy team · Updated 23 Nov 2026

Green energy open access lets a consumer with 100 kW or more of contracted demand buy renewable power from a generator of its choice through the grid. In AP, APERC set the rules and charges in its 2024 green open access regulation. You pay the generator plus grid and other charges.

We never ask for OTP, bank details or fees.

in one line

Buy green power from a generator of your choice, through the grid, if your demand is 100 kW or more.

100 kW
demand, one or more connections
2024
APERC's green open access rules
grid
charges set by APERC

Source: Ministry of Power green energy open access rules, 2022, as amended in 2023; APERC green open access regulation, 2024

the idea

what is green energy open access?

Normally your DISCOM supplies all your power. Open access lets you buy some or all of it from another generator, carried over the same grid. Green open access is for renewable power, such as solar or wind. You pay the generator's price plus grid and other charges set by the regulator.

join the business waitlist

11

Generator

A solar or wind plant agrees to sell you power.

22

The grid

Power travels over the transmission and APEPDCL network.

33

Your connection

Units are credited against your use.

44

Your bill

Generator's price plus grid charges, set by APERC.

who qualifies

who can use green open access?

Under the national rules, consumers whose contracted demand is 100 kW or more, on one connection or several together, can buy green power through open access. APERC's 2024 regulation applies those rules in Andhra Pradesh and sets the charges, banking and settlement terms.

100 kW
contracted demand
On one connection or several together.
APERC
sets the charges
And the banking and settlement terms in AP.

Source: Ministry of Power green energy open access rules, 2022, as amended in 2023; APERC green open access regulation, 2024

the cost

is open access cheaper?

It can be, but compare the landed cost per unit, not the generator's headline price. Add the grid charges and any other charges APERC sets, then compare with your own tariff, for example ₹7.65 a unit plus demand charges on HT commercial supply at 11 kV.

commercial tariff in AP

other routes

what if my load is smaller?

Below 100 kW, open access isn't open to you, but a rooftop system of your own is. For businesses that want plant-scale solar without contracting for it themselves, EdgeGrid's waitlist collects demand for supply from ground-mounted plants in APEPDCL's area.

open access vs EdgeGrid · join the waitlist

questions people ask

What is open access in renewable energy?+

Buying renewable power from a generator of your choice through the grid, instead of only from your DISCOM, and paying grid charges set by the regulator.

What are the green energy open access rules in Andhra Pradesh?+

APERC's 2024 green open access regulation applies the national rules in AP and sets the charges, banking and settlement terms.

Is there a green energy open access portal?+

Applications run through the state's nodal agency for open access. Check APERC's and the state transmission utility's websites for the current process.

get on the list before supply opens.