HT industry pays by time of day. At 11 kV in high-demand months, a unit costs ₹7.80 in the peak, ₹6.30 at normal times and ₹5.55 off-peak, from 10 AM to 3 PM and midnight to 6 AM. Moving work out of the peak, and keeping demand inside your contract, saves before any solar.
We never ask for OTP, bank details or fees.
Peak units cost ₹7.80, off-peak ₹5.55. Every unit moved saves ₹2.25.
Source: APERC tariff order for FY2026-27, 25 March 2026
time of day
how does ToD work for a factory?
HT industry energy charges depend on the hour. In April and May, September and October, and February and March, peak units from 6 to 10 AM and 6 to 10 PM cost ₹7.80 at 11 kV. Off-peak units from 10 AM to 3 PM and midnight to 6 AM cost ₹5.55. In other months the peak rate is ₹7.30.
| slot (11 kV) | high-demand months | low-demand months |
|---|---|---|
| Peak: 6 to 10 and 18 to 22 hrs | ₹7.80 | ₹7.30 |
| Normal: 15 to 18 and 22 to 24 hrs | ₹6.30 | ₹6.30 |
| Off-peak: 10 to 15 and 0 to 6 hrs | ₹5.55 | ₹5.55 |
- high-demand months
- ₹7.80
- low-demand months
- ₹7.30
- high-demand months
- ₹6.30
- low-demand months
- ₹6.30
- high-demand months
- ₹5.55
- low-demand months
- ₹5.55
High-demand months: April to May, September to October, February to March.
Source: APERC tariff order for FY2026-27, 25 March 2026
worked month
what does shifting load save?
A factory using 50,000 units in a high-demand month, a fifth of them in the peak, pays about ₹3.19 lakh in energy at 11 kV. Moving 5,000 units from the peak into the 10 AM to 3 PM slot saves about ₹11,250 that month, with no new equipment.
- Peak10,000 units at ₹7.80
- ₹78,000
- Normal25,000 units at ₹6.30
- ₹1,57,500
- Off-peak15,000 units at ₹5.55
- ₹83,250
- Move 5,000 units from peak to off-peak5,000 × ₹2.25
- −₹11,250
Energy only; demand and customer charges are separate. An illustration on FY2026-27 rates.
Source: APERC tariff order for FY2026-27, 25 March 2026
demand
how do demand charges hit a factory?
The demand charge is set by your highest 15-minute demand in the month, or 80% of your contracted demand if that is higher. Motors starting together can set a spike that costs more than a whole shift's savings. Above your contract, the excess is charged at twice the normal rate.
demand calculator
one peak, a month's charge
HT commercial at 11 kV: ₹475 per kVA of billing demand. Billing demand is your highest recorded demand or 80% of the contracted demand, whichever is higher. Demand above the contract is charged at twice the rate.
demand charge this month
₹90,250
- billing demand
- 170 kVA
- normal charge
- ₹80,750
- penalty on 20 kVA above contract
- ₹9,500
Staggering the loads that start together could save about ₹9,500 this month.
Rates: APERC tariff order for FY2026-27, 25 March 2026.
solar
which solar route suits a factory?
A factory roof can carry a large rooftop system that covers daytime use, which falls mostly in the cheaper off-peak and normal slots. Factories with 100 kW or more of demand can also buy green power through open access. EdgeGrid's waitlist offers plant-scale solar without running the process.
questions people ask
Which type of solar suits industrial use?+
Large rooftop systems cover daytime use; open access suits loads of 100 kW or more; plant-scale supply through the waitlist suits factories that don't want to run it.
How do I reduce the electricity bill in a factory?+
Move flexible work out of the peak slots, stagger motor starts to keep demand inside your contract, and check your contracted demand isn't far above your real peak.
What does a 1 acre solar plant cost?+
It depends on the land, connection and equipment. For most factories, the better question is the cost per unit compared with your tariff.