Clean power for business · factories

Cut your factory's
power costs.

By the EdgeGrid energy team · Updated 23 Nov 2026

HT industry pays by time of day. At 11 kV in high-demand months, a unit costs ₹7.80 in the peak, ₹6.30 at normal times and ₹5.55 off-peak, from 10 AM to 3 PM and midnight to 6 AM. Moving work out of the peak, and keeping demand inside your contract, saves before any solar.

We never ask for OTP, bank details or fees.

HT industry, 11 kV, high-demand months

Peak units cost ₹7.80, off-peak ₹5.55. Every unit moved saves ₹2.25.

₹7.80
peak, 6 to 10 and 18 to 22 hrs
₹6.30
normal hours
₹5.55
off-peak, 10 to 15 and 0 to 6 hrs

Source: APERC tariff order for FY2026-27, 25 March 2026

time of day

how does ToD work for a factory?

HT industry energy charges depend on the hour. In April and May, September and October, and February and March, peak units from 6 to 10 AM and 6 to 10 PM cost ₹7.80 at 11 kV. Off-peak units from 10 AM to 3 PM and midnight to 6 AM cost ₹5.55. In other months the peak rate is ₹7.30.

join the business waitlist

Peak: 6 to 10 and 18 to 22 hrs
high-demand months
₹7.80
low-demand months
₹7.30
Normal: 15 to 18 and 22 to 24 hrs
high-demand months
₹6.30
low-demand months
₹6.30
Off-peak: 10 to 15 and 0 to 6 hrs
high-demand months
₹5.55
low-demand months
₹5.55

High-demand months: April to May, September to October, February to March.

Source: APERC tariff order for FY2026-27, 25 March 2026

worked month

what does shifting load save?

A factory using 50,000 units in a high-demand month, a fifth of them in the peak, pays about ₹3.19 lakh in energy at 11 kV. Moving 5,000 units from the peak into the 10 AM to 3 PM slot saves about ₹11,250 that month, with no new equipment.

worked example
50,000 units, HT industry at 11 kV
Peak10,000 units at ₹7.80
₹78,000
Normal25,000 units at ₹6.30
₹1,57,500
Off-peak15,000 units at ₹5.55
₹83,250
Move 5,000 units from peak to off-peak5,000 × ₹2.25
−₹11,250
Energy after the shift₹3,07,500

Energy only; demand and customer charges are separate. An illustration on FY2026-27 rates.

Source: APERC tariff order for FY2026-27, 25 March 2026

demand

how do demand charges hit a factory?

The demand charge is set by your highest 15-minute demand in the month, or 80% of your contracted demand if that is higher. Motors starting together can set a spike that costs more than a whole shift's savings. Above your contract, the excess is charged at twice the normal rate.

demand charges explained

demand calculator

one peak, a month's charge

HT commercial at 11 kV: ₹475 per kVA of billing demand. Billing demand is your highest recorded demand or 80% of the contracted demand, whichever is higher. Demand above the contract is charged at twice the rate.

demand charge this month

₹90,250

billing demand
170 kVA
normal charge
₹80,750
penalty on 20 kVA above contract
₹9,500

Staggering the loads that start together could save about ₹9,500 this month.

Rates: APERC tariff order for FY2026-27, 25 March 2026.

solar

which solar route suits a factory?

A factory roof can carry a large rooftop system that covers daytime use, which falls mostly in the cheaper off-peak and normal slots. Factories with 100 kW or more of demand can also buy green power through open access. EdgeGrid's waitlist offers plant-scale solar without running the process.

open access vs EdgeGrid · join the waitlist

questions people ask

Which type of solar suits industrial use?+

Large rooftop systems cover daytime use; open access suits loads of 100 kW or more; plant-scale supply through the waitlist suits factories that don't want to run it.

How do I reduce the electricity bill in a factory?+

Move flexible work out of the peak slots, stagger motor starts to keep demand inside your contract, and check your contracted demand isn't far above your real peak.

What does a 1 acre solar plant cost?+

It depends on the land, connection and equipment. For most factories, the better question is the cost per unit compared with your tariff.

get on the list before supply opens.